Commonwealth-Tandang Sora Flyover

The bridge is a 9-span reinforced concrete deck girder with a total length of 260 meters with a clear roadway of 13.92 m. Seismic retrofitting work includes concrete shear keys on abutments and all piers and cable restrainers.
Barangka Viaduct

The bridge is an 8-span prestressed concrete girder with a total length of 165 meters with a clear roadway width of 6.65 m. Seismic retrofitting work includes concrete shear keys, steel jackets on all piers, cable restrainers and 50mm asphalt overlay.
Baguio Flyover

Consultancy Services for the Detailed Engineering for the Baguio Flyover, Baguio City, Philippines. The project is a 172 meter long, two-way flyover located at the Baguio General Hospital Rotonda. It is the second flyover constructed in the City of Baguio (the first was the Magsaysay Avenue Flyover), and was opened to the public on January […]
Nagtahan-Mendoza Viaduct

The bridge is a 26-span prestressed concrete girder with a total length of 850 meters. The scope of seismic retrofitting work includes steel jackets and cable restrainers at piers.
Magallanes Interchange

The bridge is composed of three structures, Manila- Alabang Lane (301.60m, 13-spans, 12 piers), Cubao-Manila Lane (355.65m, 8-spans), Alabang-Cubao Lane (360.25m, 8-spans). All lanes with deckslab on steel girder. The retrofit works includes shear keys on abutment & piers, steel jackets and cable restrainers for all piers.
Legarda R. Magsaysay Viaduct

Ortigas Interchange

The bridge is composed of 4 structures, East and West Ramps, North and South bound flyovers with 52-spans PSCG, total length of 482.91m. The retrofit works are concrete shear keys, steel jackets, footing retrofit, cable restrainer, pedestal strengthening and repair of cracks.
Edsa Santolan Flyover

The bridge is a 14-span prestressed concrete girder with a total length of 210 m. The scope of retrofit works are shear keys, cable restrainer & approach slab.
Gil Puyat Flyover

The bridge is a 7-span prestressed concrete girder with a total length of 185 meter with a clear roadway width of 10.75 meter. The scope of retrofit works are shear keys on abutments, steel jackets and cable restrainer on piers.
Nagtahan Bridge

The bridge is a 25-span combination of reinforced concrete deck girder and steel girder with a total length of 446.10 m. Seismic retrofitting work includes shear keys on all piers, steel jackets, pier cap strengthening, cable restrainers and painting of all steel members including bearings.