The Maynilad facilities are situated near active fault system. The purpose of this project is to create detailed engineering design of the necessary rectification and retrofit solutions for the existing six (6) Maynilad facilities located within Metro Manila which will restore the normal physical conditions of the facilities and improve the operational stability and reliability. Thus, sustaining and maintaining the Integrated Management System compliances.


