Advisory Services, National Road Improvement and Management Project

Advisory Services, National Road Improvement and Management Project. The project is the upgrading and rehabilitation of about 536 kms of national arterial roads. These roads comprise the Civil Works component of NRIMP 1. The road projects serve as major links among the provinces of the regional growth centers wherein they are located. The project shall […]
Detailed Engineering Design of the 22km Length Access Road Works of the 60MW Hydroelectric Power Project

The 60MW Kapangan Hydroelectric Power Project will be developed on the Amburayan River in the Province of Benguet and Santol in La Union. In general, existing access roads consist of uphill and downhill terrains of concrete roads passing through a number of bridge crossings that provides access to the project site. The site requires construction […]
Consultancy Services for the Preliminary Detailed Engineering Design of the Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads Including ROW and Drainage Based on PMS/HDM-4 – Tertiary Roads Along Guihulngan-Baloc-Isabela Road

The scope of the project is to carry out the preliminary engineering design at the intermittent sections including estimates/quantification of the road located in Guihulngan City, Negros Oriental. The overall length of the road sections to be improved is approximately 8.14kms.
Consultancy Services for the Kalinga Roads and PADS Engineering Design Project

Provision of three new well pads and access road in preparation for Kalinga Developer’s Drilling program. It is located in Pasil which is about 40 kilometers straight distance from Tabuk City, capital of Kalinga Province.
Consultancy Services for the Preliminary Detailed Engineering Design Including Topographic Survey and Geotechnical Investigation for San Remigio-Bugo-Gen. Fullon Road, Antique

The Consultant shall be responsible for carrying out the necessary topographic survey, detailed engineering design and soil investigation in respect of the projects cited above.The overall length of the road sections to be improved is approximately 25.0 kms.
Consultancy Services for the Preliminary Detailed Engineering for the Construction of By-Passes / Diversion Roads, Including ROW Along Metro Dumaguete Diversion Road, Dumaguete – Sibulan Road

The scope of the project is to carry out the preliminary engineering design including estimates/quantification for the widening of an existing two-lane road and provision of sidewalks. The project, comprised of two (2) segments and approximately 5.10 km. in total length, is located at the 2nd L.D. of Negros Oriental as K0+000 to K4+245.68 and […]
Preliminary Design Under the Road Network Development Project in Conflict Affected Areas in Mindanao

Consists of six (6) road sub-projects located in the provinces of Lanao del Sur and Maguindanao. The project includes the Preliminary Design, for funding purposes of sub-projects No. 1,2, 6, 7, 8 & 9 wherein sub-projects 2 & 7 were divided into 2 packages and sub-projects, 6 was divided into 3 packages. The total length […]
Consultancy Services for the Preliminary Detailed Engineering Design for the Construction of Missing Gaps Connecting National Roads Including ROW Along Bayawan-Kabankalan Road, Negros Oriental

The scope of the project is to carry out the preliminary engineering design at the intermittent sections including estimates/quantification of the road located at the southwest coastline of Bayawan City, Negros Oriental. The overall length of the road sections to be improved is approximately 8.147kms.
South Samar Coastal Road

Review of Detailed Design and Construction Supervision, Arterial Road Link Development Project-Phase II, South Samar Coastal Road and Northwest Leyte.
Detailed Engineering Design of Priority Highway Projects (SONA Projects)

Puerto Princesa – Aborlan Road Section, Palawan CP-3B-1(a) Puerto Princesa Junction – Inapsan Junction (Sta 2+376-Sta 22+920) has an estimated length of 20.544 km.