Detailed Engineering Design of the 22km Length Access Road Works of the 60MW Hydroelectric Power Project

Project Description

The 60MW Kapangan Hydroelectric Power Project will be developed on the Amburayan River in the Province of Benguet and Santol in La Union. In general, existing access roads consist of uphill and downhill terrains of concrete roads passing through a number of bridge crossings that provides access to the project site. The site requires construction of access roads to be able access all major civil components of the Project especially the adit portals of the tunnel.  The aim of COHECO is to implement a Hydropower Facility under an early works (access road works) and various split contracts arrangement covering major works such as civil, electro-mechanical supply and transmission facilities.

RELATED PROJECTS

Advisory Services, National Road Improvement and Management Project

Consultancy Services for the Preliminary Detailed Engineering Design of the Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads Including ROW and Drainage Based on PMS/HDM-4 – Tertiary Roads Along Guihulngan-Baloc-Isabela Road

Consultancy Services for the Kalinga Roads and PADS Engineering Design Project

Consultancy Services for the Preliminary Detailed Engineering Design Including Topographic Survey and Geotechnical Investigation for San Remigio-Bugo-Gen. Fullon Road, Antique

Consultancy Services for the Preliminary Detailed Engineering for the Construction of By-Passes / Diversion Roads, Including ROW Along Metro Dumaguete Diversion Road, Dumaguete – Sibulan Road

Preliminary Design Under the Road Network Development Project in Conflict Affected Areas in Mindanao

Leading. Professional. Visionary. Excellent. Dedicated. Consulting since 1938. ALAI is ISO 9001:2015 QMS Certified.

Delivering innovative, sustainable solutions from concept to completion.