The Project is located in the Municipality of Aroroy, the northernmost town in the main island of the Province of Masbate in the Bicol Region. The road has a total length of 32.044 km, eight (8) bridges and an approximately 2.00 km viaduct to make up for the entire Project. The Proposed Aroroy Proper-Mataba Project aims to ease up traffic interconnections along the critical section of the road network system going through the nine (9) barangays in Aroroy, Masbate as the traffic volume increases with the ever-expanding area population growth, over time.


